Service bulletin SF647
A bulletin is a manufacturer's communication to its dealers, as NHTSA indexes it. The summary is NHTSA's. The document is the manufacturer's: read it at NHTSA. A bulletin is not a recall, and listing a model year does not mean every vehicle of it is concerned.
| Type | Service bulletin |
|---|---|
| NHTSA id | 10214908 |
| Published by NHTSA | 2022-07-02 |
| Manufacturer's number | SF647 |
| Manufacturer's date | 2022-06-07 |
| NHTSA component | STRUCTURE |
NHTSA's summary
Freightliner Field Service Campaign for Freightliner Cascadia Integral Tail Lamp and Back Up Alarm Bracket
The document
The document is the manufacturer's. This site does not hold it. NHTSA files a document at one of these two addresses; we have not asked NHTSA which.
Components
Body and frame
| FREIGHTLINER CASCADIA | 2022 |
|---|
Listing a model year does not mean every vehicle of it is concerned: the document says which.
| SB60-180 | 2023-11-03. Service bulletin. Revised Service Bulletin for Cab Isolator for Trucks Domiciled in Mexico |
|---|---|
| SB60-180 | 2023-10-05. Service bulletin. Revised Freightliner Service Bulletin for Cab Isolator for Trucks Operating in Extreme Conditions. Description of Revisions: This bulletin replaces the version dated June 2023. The title has been updated. |
| FP31-031 | 2023-09-16. Service bulletin. Freightliner Parts Bulletin for Aero Bumper Air Dam Part Supersession |
| CALFTL31-006 | 2023-09-02. Service bulletin. Customer Advisory Letter for Center Drive Wheel Fairing Frame Rail Support Bracket Inspection |
| FAB285 | 2021-07-24. Service bulletin. Freightliner Action Bulletin FAB285CAS Ultra Lightweight Package |
| FAB154 | 2021-05-18. Service bulletin. Freightliner Action Bulletin FAB154 New options for Cascadia |
| FAB145 | 2021-05-18. Service bulletin. Freightliner Action Bulletin FAB145 New Cascadia Roof Fairing |
| SB60-174 | 2021-01-22. Service bulletin. Freightliner Service Bulletin for Replacement Cab Doors with Pre-Drilled Holes. Replacement doors for New Cascadia vehicles are now pre-drilled with two holes for the installation of turning vanes. If turning vanes are not installed, the pre-drilled holes need to be plugged with ratchet fasteners. |