Service bulletin FAB285
A bulletin is a manufacturer's communication to its dealers, as NHTSA indexes it. The summary is NHTSA's. The document is the manufacturer's: read it at NHTSA. A bulletin is not a recall, and listing a model year does not mean every vehicle of it is concerned.
| Type | Service bulletin |
|---|---|
| NHTSA id | 10199390 |
| Published by NHTSA | 2021-07-24 |
| Manufacturer's number | FAB285 |
| Manufacturer's date | 2021-04-01 |
| NHTSA component | STRUCTURE |
NHTSA's summary
Freightliner Action Bulletin FAB285CAS Ultra Lightweight Package
The document
The document is the manufacturer's. This site does not hold it. NHTSA files a document at one of these two addresses; we have not asked NHTSA which.
Components
Body and frame
| FREIGHTLINER CASCADIA | 2022 |
|---|
Listing a model year does not mean every vehicle of it is concerned: the document says which.
| SB60-180 | 2023-11-03. Service bulletin. Revised Service Bulletin for Cab Isolator for Trucks Domiciled in Mexico |
|---|---|
| SB60-180 | 2023-10-05. Service bulletin. Revised Freightliner Service Bulletin for Cab Isolator for Trucks Operating in Extreme Conditions. Description of Revisions: This bulletin replaces the version dated June 2023. The title has been updated. |
| FP31-031 | 2023-09-16. Service bulletin. Freightliner Parts Bulletin for Aero Bumper Air Dam Part Supersession |
| CALFTL31-006 | 2023-09-02. Service bulletin. Customer Advisory Letter for Center Drive Wheel Fairing Frame Rail Support Bracket Inspection |
| SF647 | 2022-07-02. Service bulletin. Freightliner Field Service Campaign for Freightliner Cascadia Integral Tail Lamp and Back Up Alarm Bracket |
| FAB154 | 2021-05-18. Service bulletin. Freightliner Action Bulletin FAB154 New options for Cascadia |
| FAB145 | 2021-05-18. Service bulletin. Freightliner Action Bulletin FAB145 New Cascadia Roof Fairing |
| SB60-174 | 2021-01-22. Service bulletin. Freightliner Service Bulletin for Replacement Cab Doors with Pre-Drilled Holes. Replacement doors for New Cascadia vehicles are now pre-drilled with two holes for the installation of turning vanes. If turning vanes are not installed, the pre-drilled holes need to be plugged with ratchet fasteners. |