{"nhtsa_id":6091337,"type":"service_bulletin","type_name":"Service bulletin","date_added":"2000-08-08","date":"1997-12-08","document_id":"972804","mfr_campaign":null,"replaces":null,"component":"ENGINE AND ENGINE COOLING","mfr_system":null,"summary":"SEALING THE OIL PUMP/WATER PUMP, THE TWO HOLES AT BOTTOM OF OIL PUMP INTERMEDIATE FLANGE AND PUMP CASING SHOULD BE SEALED AT SAMR TIME. *AK","document":null,"url":"https://open.wenmarpro.com/bulletins/6091337","components":[{"id":"engine","name":"Engine","parent":null}],"codes":[],"topics":[],"vehicles":[{"make":"BMW","model":"K 1200 RS","year_from":null,"year_to":null,"match":"exact","vehicle_ids":[]}],"as_of":"2026-10-19","note":"A bulletin is a manufacturer's communication to its dealers, as NHTSA indexes it. The summary is NHTSA's. The document is the manufacturer's: read it at NHTSA. A bulletin is not a recall, and listing a model year does not mean every vehicle of it is concerned.","attribution":[]}