Service bulletins for the 2013 Subaru Outback
A bulletin is a manufacturer's communication to its dealers, as NHTSA indexes it. The summary is NHTSA's. The document is the manufacturer's: read it at NHTSA. A bulletin is not a recall, and listing a model year does not mean every vehicle of it is concerned.
519 on file from NHTSA, as of 2026-10-19.
By type
By component
By trouble code
Only bulletins with component: Engine are shown. Show all
| 11-145-14R | 2016-06-02. Service bulletin. ENGINE; ELECTRICAL SYSTEM:SOFTWARE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
|---|---|
| 02-157-14R | 2016-06-02. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 11-145-14R | 2016-06-02. Service bulletin. ELECTRICAL SYSTEM:SOFTWARE; ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 8-1-2014 | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 02-143-13R | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 02-156-14 | 2016-05-23. Service bulletin. ENGINE AND ENGINE COOLING:ENGINE:GASOLINE:BELTS AND ASSOCIATED PULLEYS. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 02-150-14R | 2016-05-23. Service bulletin. ENGINE AND ENGINE COOLING:EXHAUST SYSTEM:EMISSION CONTROL:GAS RECIRCULATION VALVE (EGR VALVE). REVISED VALVE TRAIN PARTS TO REDUCE A WARM ENGINE TAPPING SOUND FROM THE LEFT CYLINDER HEAD. |
| 2-22-13 | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 11-130-13R | 2016-05-23. Service bulletin. ENGINE AND ENGINE COOLING:EXHAUST SYSTEM. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 11-131-13 | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 11-130-13 | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 02-143-13R | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 12-159-13 | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 02-143-13R | 2016-05-23. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 11-130-13R | 2016-05-19. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 16-80-11R | 2016-05-13. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 16-86-12 | 2016-05-13. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 11-122-12 | 2016-05-13. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| 11-121-12 | 2016-05-13. Service bulletin. ENGINE. SUMMARY TO BE PROVIDED ON A FUTURE DATE. |
| SB-02-143-13R | 2014-01-03. Service bulletin. ENGINE. SUBARU: A CHANGE TO SURFACE TREATMENT APPLIED TO OIL CONTROL PISTON RINGS AND IF CONDITION REMAINS , THE OIL CONSUMPTION WILL BE HIGHER AND CONSISTENT, IF WEAR OCCURS, UNTIL REPAIR IS MADE. MODEL 2013 LEGACY, OUTBACK. *PE |
| TSB-11-130-13R | 2013-08-06. Service bulletin. ENGINE. SUBARU: SOME VEHICLES MAY EXPERIENCE DIFFICULTY STARTING, ROUGH IDLE, CAM POSITION OR MISFIRE DTCS. THIS BULLETIN CONTAINS THE INSPECTION AND REPAIR. *JS UPDATED 11/18/14. *PE |
| SB-11-122-12 | 2013-02-01. Service bulletin. ENGINE. SUBARU: REPAIR AND INSPECTION PROCEDURE OF RELATED CAMSHAFT POSITION, REGARDING CHECK ENGINE LIGHT ON, NO START OR LONG CRANKING, AND POSSIBLY CAMSHAFT POSITION SENSOR CLEARANCE OUT OF SPECIFICATION. MODELS 2013 LEGACY AND OUTBACK. *PE |
| WQC-39 | 2012-12-04. Service bulletin. ELECTRICAL SYSTEM:SOFTWARE; ENGINE. SUBARU: SEE DOCUMENT SEARCH BUTTON FOR OWNER LETTER. SOFTWARE CHANGE WILL NOT AFFECT FUEL ECONOMY OR PERFORMANCE, EVEN THOUGH A CORRECTION, FOR ENGINE CONTROL MODULE, HAS BEEN DEVELOPED FOR THE DEFICIENCY IN OBDII SYSTEM THERMOSTAT MONITORING LOGIC. MODELS 2011-2012 LEGACY, OUTBACK, IMPREZA SEDAN, WAGON, FORESTER, TRIBECA AND 2013 BRZ. *PE UPDATED 1/31/13. *PE |
The summaries are NHTSA's. Each bulletin's page links NHTSA's copy of the manufacturer's document.