Service bulletin SB-49-11
A bulletin is a manufacturer's communication to its dealers, as NHTSA indexes it. The summary is NHTSA's. The document is the manufacturer's: read it at NHTSA. A bulletin is not a recall, and listing a model year does not mean every vehicle of it is concerned.
| Type | Service bulletin |
|---|---|
| NHTSA id | 10055494 |
| Published by NHTSA | 2014-06-04 |
| Manufacturer's number | SB-49-11 |
| Manufacturer's date | 2014-02-01 |
| NHTSA component | FUEL SYSTEM, DIESEL:STORAGE:TANK ASSEMBLY |
NHTSA's summary
WESTERN STAR: IF DIESEL EXHAUST FLUID (DEF) SYSTEMS IS SITTING FOR EXTENDED TIME, IN TANK, WILL CRYSTALLIZE AROUND FLOAT OF LEVEL SENDING UNIT TUBE AND NEEDS CLEANING TO PREVENT A FALSE OR INCORRECT GAUGE READING. MODEL CONSTALLATION, 4700, 4800, 4900, 5900, 6900. NO YEARS LISTED. *PE
The document
No address for NHTSA's copy can be built for this communication. Ask the dealer for it by the manufacturer's number.
Components
Fuel system, Fuel tank
| WESTERN STAR 4700 | 2014 |
|---|---|
| WESTERN STAR 4900 | 2014 |
| WESTERN STAR 6900 | 2014 |
| WESTERN STAR CONSTELLATION | 2012 |
Listing a model year does not mean every vehicle of it is concerned: the document says which.
| 0607-17 | 2019-04-08. Service bulletin. SPN 96 (MCM) (GHG17) |
|---|---|
| 707-13 | 2018-06-18. Service bulletin. 707-13 Description and Operation of the HC Doser Fuel Supply Pressure Control Valve - Two Filter System |
| 611-13 | 2018-06-18. Service bulletin. 611-13 Removal and Installation of the GHG14 Six-Gallon Diesel Exhaust Fluid Tank Header |
| 0127-17 | 2018-04-16. Service bulletin. 0127-17 SPN 1077 FMI 14 (GHG14) (GHG17) (MCM) |
| 1110-14 | 2017-10-21. Service bulletin. 1110-14 EPA10 DOC Inlet Pressure Sensor |
| WS-49-13 | 2014-06-05. Service bulletin. WESTERN STAR: AT RETURN LINE FITTING, DURING COLD EXTREME TEMPERATURES, THE DIESEL EXHAUST FLUID (DEF) TANK WOULD FREEZE. *PE |
| WSB-49-11 | 2014-02-13. Service bulletin. WESTERN STAR: WHEN TRUCK SITS, FOR ANY EXTENDED PERIOD, WITH A DIESEL EXHAUST FLUID (DEF) SYSTEM, IT WOULD CRYSTALLIZED, IN THE TANK, AROUND FLOAT, ON DEF LEVEL SENDING UNIT TUBE AND NEEDS TO BE CLEANED. *PE |